BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next...

1 answer below »
UNDERTAKE PROJECT WORK


BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next Review: Aug 2020 Page 21 of 32 � � 6. Assessment Tasks �ssessment�Task�1:�� �ssessment�Task� Develop�a�Project�Proposal� Schedule� TB�� Outcomes��ssessed� Performance�Criteria:� � 1.1,�1.3,�1.5,�1.6,�2.2,�2.3,�2.5,�3.6� � �ddresses�some�elements�of�required�skills�and� knowledge�as�shown�in�the��ssessment�Matrix� � Description:� � The�purpose�of�a�project�proposal�is�to�determine�if�a�proposed�project�is�feasible,�practical,�and�worth� pursuing.��Project�proposals�are�documents�designed�to�present�purpose,�objectives,�proposed�solution,�scope,� costs�and�risks�associated�with�a�project.�� � In�this�assessment�task,�you�will�be�required�to�prepare�a�proposal�for�a�simple�project�using�the�guidelines� provided�below.�Some�of�the�examples�of�projects�could�be;� � §� Developing�a�website�for�your�organisation� §� Introducing�a�new�product�in�the�market� §� Implementing�a�new�IT�system�in�your�organisation� §� Setting�up�a�children’s�playground�in�your�locality�acting�as�a�community�organisation� §� Landscaping�your�garden� §� Building�a�pergola�in�your�new�house� � Note:�For�learners�currently�working,�it�is�strongly�advised�that�they�choose�a�workplace‐based�project�with� due�management�permission�and�work�supervision�arrangements.�You�will�be�required�to�provide�a�Third‐ Party�Verification�Report�(template�will�be�provided�by�your�trainer/assessor)�for�all�the�works�completed�in� the�workplace.�� � �lternatively,�you�may�conceive�other�project�ideas�based�on�your�interest.�Discuss�your�project�idea/concept� with�your�trainer/assessor�if�you�are�unsure.�Once�you�have�finalised�your�project,�prepare�a�project�proposal� covering�the�following�points;� � §� Background�(Problem‐�why�the�project�is�needed)� §� Purpose/Objectives�of�the�project� §� Project�Scope�(what�will�the�project�accomplish�–�the�solution)�� §� Project�duration�(Expected�start�and�end�dates)� §� Perceived�obstacles�and�risks�including�OHS�requirements� §� Perceived�costs�and�benefits� §� Required�resources�and�record�keeping�systems� � For�the�purpose�of�task,�trainer/assessor�will�play�the�role�of�your�supervisor�and�provide�appropriate�context� and�workplace�conditions�through�simulated�classroom‐based�activities/arrangements.�� BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next Review: Aug 2020 Page 22 of 32 � � The�proposal�must�be�word�processed�and�structured�with�appropriate�headings�and�sub‐headings�as�needed.� It�must�be�prepared�as�a�formal�business�document�that�can�be�seen�as�an�official�document�for�submission�to� the�management.��ll�external�sources�must�be�appropriately�cited�and�acknowledged�using�the�Harvard� referencing�system.�Your�trainer/assessor�will�provide�you�with�referencing�guidelines.� � �ssessment�criteria� � The�following�assessment�criteria�will�be�used�for�marking�this�assessment�task.�Ensure�that�you�have� addressed�all�of�the�criteria�in�your�work.� � §� Completed�the�task�in�a�workplace�environment�and/or�a�simulated�classroom‐based�environment� §� �ppropriate�roles�(workplace)�and/or�role‐plays�were�selected�and�defined�for�the�purpose�of�this� task� §� The�task�demonstrates�evidences�of�due�communication,�consultation,�and�permissions�either�in�a� workplace�or�a�simulated�classroom‐based�environment� §� The�proposal�is�appropriately�structured�and�presented�as�an�official�document�reflecting�a�real‐life� practice�� §� �ppropriate�headings�and�sub‐headings�are�used�to�structure�the�contents� §� The�content�flow�covers�all�the�required�elements�of�the�proposal�and�contains�a�logical�sequence�of� the�topics�� §� Project�background�is�described�to�highlight�the�problem�(need)� §� Goals�and�objectives�are�consistent�with�the�project�need� §� Project�scope�proposes�the�works�that�need�to�be�accomplished�to�address�the�need� §� Project�duration�is�proposed�and�is�consistent�with�perceived�costs� §� ��cost�benefit�analysis�is�developed�based�on�key�estimated�project�expenditures�� §� Risk�analysis�addresses�perceived�obstacles�and�contingencies�including�OHS� §� Resources�and�record�keeping�systems�for�the�project�are�identified�and�described� §� �ll�external�sources�are�acknowledged�and�cited�according�to�the�Harvard�Referencing�System� � � Submission�Guidelines� � Submit;� � §� Hard�copy�of�Project�Proposal�� §� Third‐Party�Verification�Report�(if�undertaken�in�a�workplace)� � Electronic�versions�of�the�assessment�task�and�email/electronic�submission�arrangements�are�at�further� discretion�of�the�trainer/assessor.� � � � � BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next Review: Aug 2020 Page 23 of 32 � � �ssessment�Task�2:�� �ssessment�Task� Develop�a�Project�Plan� Schedule� TB�� Outcomes��ssessed� Performance�Criteria:� � 1.1,�1.2,�1.3,�1.4,�1.5,�1.6,�2.1,�2.2,�2.3,�2.4,�2.5,�2.6,� 3.1,�3.2,�3.3,�3.4,�3.5,�3.6,�3.7,�4.1,�4.2,�4.3,�5.1,�5.2,� 5.3�� � �ddresses�some�elements�of�required�skills�and� knowledge�as�shown�in�the��ssessment�Matrix� � � Description:� � This�assessment�task�builds�on��ssessment�Task1:�Develop�a�Project�Proposal.�In�an�organisational�context,� once�a�project�proposal�is�approved,�it�is�followed�by�a�project�plan�that�outlines�project�stakeholders,� deliverables,�key�tasks,�budgets,�constraints,�required�resources�and�most�importantly�the�project�time�line.�� � �ccording�to�the�Project�Management�Body�of�Knowledge,�is�a�formal,�approved�document�used�to�guide�both� project�execution�and�project�control.�The�primary�uses�of�the�project�plan�are�to�document�planning� assumptions�and�decisions,�facilitate�communication�among�stakeholders,�and�document�approved�scope,� cost,�and�schedule�baselines.� � In�this�assessment�task,�you�will�continue�the�information�crated�in��ssessment�Task1:�Develop�a�Project� Proposal�and�develop�a�project�plan�based�on�the�suggested�structure�below.�The�scheduling�part�of�the�plan� should�be�completed�on�Microsoft�Project.�If�Microsoft�Project�is�not�available,�Microsoft�Excel�can�be�used�to� develop�a�Gantt�chart.�Essentially,�a�project�plan�will�include;� � Project�Details� Executive�Summary� Purpose�and�Objectives� Project�Scope�� Key�Stakeholders�and�responsibilities� Project�Team�Strategy� Deliverables� Task�Breakdown�Structure� Project�Budget� Perceived�risks�and�constraints� Resources�and��llocations� Project�Timeline/Schedule� Project�sign‐offs�and�approvals� Project�Evaluation�Tools� � You�may�use�the�above�elements�as�key�headings�for�your�project�plan.�The�project�schedule�must�be� completed�using�the�Gantt�chart.��The�project�plan�must�also�include�team�management�strategies�including� team�communication,�quality�objectives,�performance�objectives�and�team�development.� � BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next Review: Aug 2020 Page 24 of 32 � � For�the�purpose�of�this�task,�trainer/assessor�will�play�the�role�of�your�supervisor�and�provide�appropriate� context�and�workplace�conditions�through�simulated�classroom‐based�activities/arrangements.�� � The�plan�must�be�word�processed�and�structured�with�appropriate�headings�and�sub‐headings�as�needed.�It� must�be�prepared�as�a�formal�business�document�that�can�be�seen�as�an�official�document�for�submission�to� the�management.� � Originality�of�the�work�must�be�maintained�throughout�and�all�efforts�must�be�made�to�avoid�a�simple�cut�and� paste�from�external�resources,�which�may�result�in�plagiarism�without�appropriate�referencing.�� � �ssessment�Criteria� � The�following�assessment�criteria�will�be�used�for�marking�this�assessment�task.�Ensure�that�you�have� addressed�all�of�the�criteria�in�your�work.� §� Completed�the�task�in�a�workplace�environment�and/or�a�simulated�classroom‐based�environment� §� �ppropriate�roles�(workplace)�and/or�role‐plays�were�selected�and�defined�for�the�purpose�of�this� task� §� The�task�demonstrates�evidences�of�due�communication,�consultation,�and�permissions�either�in�a� workplace�or�a�simulated�classroom‐based�environment� §� The�plan�is�appropriately�structured�and�presented�as�an�official�document�reflecting�a�real‐life� example�� §� �ppropriate�headings�and�sub‐headings�are�used�to�structure�the�contents� §� The�content�flow�covers�all�the�required�elements�of�the�plan�and�contains�a�logical�sequence�of�the� topics�� §� The�executive�summary�is�included�and�provides�an�overview�of�the�plan� §� Developed�project�purpose�and�objectives� §� Project�scope�proposes�the�works�that�need�to�be�accomplished�to�address�the�need� §� Identified�project�stakeholders�and�deliverable� §� Defined�roles�and�responsibilities�of�the�project�stakeholders/team�members� §� Developed�team�management�strategies�that�outline�support�and�development�objectives�� §� Developed�a�Work�Breakdown�Structure�(paper‐based)� §� Used�WBS�in�Microsoft�Project�or�Excel�to�develop�a�Gantt�Chart� §� Marked/identified�task�dependencies� §� Developed�critical�path�(Microsoft�Project�or�Excel)� §� Identified�and�marked�project�milestones� §� Prepared�a�project�timeline�consistent�with�perceived�project�duration� §� Developed�cost�baselines�based�on�tasks�identified�in�WBS� §� Prepared�a�project�budget�and�conducted�cost‐benefit�analysis� §� Identified�all�the�required�resources�and�allocated�budget� §� Risk�analysis�addresses�perceived�obstacles�and�contingencies�including�OHS� §� Developed�project�evaluation�and�reporting�tools� §� �ll�external�sources�are�acknowledged�and�cited�according�to�the�Harvard�Referencing�System� � Submission�Guidelines� � Submit:� §� Hard�copy�of�the�completed�plan�with�appropriate�assessment�cover�sheet�� §� Hard�and�electronic�copy�of�the�Gantt�Chart� §� Hard�and�electronic�copy�of�the�Critical�Path��nalysis� §� Third‐Party�Verification�Report�(if�undertaken�in�a�workplace)� Electronic�versions�of�the�assessment�task�and�email/electronic�submission�arrangements�are�at�further� discretion�of�the�trainer/assessor.�� BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next Review: Aug 2020 Page 25 of 32 � � �ssessment�Task�3:�� �ssessment�Task� Knowledge�Test� Schedule� TB�� Outcomes��ssessed� Performance�Criteria:� � Required�Knowledge� � �ddresses�some�elements�of�required�skills�and� knowledge�as�shown�in�the��ssessment�Matrix� � � INSTRUCTIONS�FOR�TR�INERS/�SSESSORS:� � This�is�a�closed�book�test�and�must�be�undertaken�in�presence�of�an�assessor.��ll�the�questions�must�be� answered.�� � Duration:�1�Hour� � �ssessment�criteria� � The�following�assessment�criteria�will�be�used�for�marking�this�assessment�task.�Ensure�that�students�have� addressed�all�of�the�criteria�in�their�work.� � §� Test�completed�in�presence�of�an�assessor�� §� �ll�the�questions�are�attempted�and�answered� §� �nswers�are�consistent�with�model�answers� §� Demonstrated�the�breadth�of�knowledge�required�within�the�context�of�this�unit� � � Submission�Guidelines� � Submit;� � §� Completed�test�paper� � � BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next Review: Aug 2020 Page 26 of 32 � � Knowledge Test: Test Paper � Test�Paper:�BSBPMG522�Undertake�Project�Work� �ssessment�Task�3� � Student�Name� � Student�ID� � Faculty/School� � Group� � Trainer� � Date�� � � � Q1.�Describe�three�different�types�of�organisational�structures�in�your�own�words.� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � Q2.�List�relevant�legislations�that�may�affect�aspects�of�project�management.�Where�would�you�find�the� required�legislative�information?� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next Review: Aug 2020 Page 27 of 32 � � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � � Q3.�List�five�key�project�parameters�that�will�be�essential�in�any�project.� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � Q4.�What�is�a�Critical�Path?�Draw�an�example�of�a�critical�path�using�the�given�information�in�the�space� below.� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next Review: Aug 2020 Page 28 of 32 � � Draw�a�Critical�Path�using�the�following�example�of�Baking�a�Loaf�of�Bread,�in�which�some�activities�depend�on� others�having�been�undertaken�in�order,�whereas�others�can�be�done�independently.� � �ctivity�� Preceded�by� Elapsed�time�(minutes)�� ��weigh�ingredients�� ‐ 1�� B�mix�ingredients�� �� 3�� C�dough�rising�time�� B� 60�� D�prepare�tins�� ‐ 1�� E�pre‐heat�oven�� ‐ 10�� F�knock�back�dough�and�place�in�tins�� C&D� 2�� G�2�nd�dough�rising�time�� F� 15�� H�cooking�time�� E�&�G� 40�� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � Q5.�Explain�how�a�project�aligns�with�organisational�plans�(e.g.�strategic�and�business�plans)� __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd t/a ALTEC College |Provider Code: 22034 | CRICOS Code: 02926D Approved by: Quality Manager | Next Review: Aug 2020 Page 29 of 32 � � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � __________________________________________________________________________________________� � �ssessment�criteria� � The�following�assessment�criteria�will�be�used�for�marking�this�assessment�task.�Ensure�that�you�have� addressed�all�of�the�criteria�in�your�work.� � §� Test�completed�as�per�the�given�instructions�and�conditions�� §� �ll�the�questions�are�attempted�and�answered� §� �nswers�are�consistent�with�model�answers�and�demonstrate�the�required�depth�of�knowledge�for� this�unit�of�competency� � Submission�Guidelines� � Submit;� � §� Completed�Test�paper� � � � � �
Answered Same DayJun 21, 2021BSBPMG522Training.Gov.Au

Answer To: BSB51918| BSBPMG522 Undertake Project Work Learner’s Guide | V 4.0 | Aug 2019 Pass Global Pty Ltd...

Swati answered on Jun 22 2021
137 Votes
Project proposal
For
Kitchen Renovation
Project introduction
Background
Kitchen being heart of a house needs to be well manages and well equipped with all requirements. It increases the sale value of property too. To renovate a house, firstly the kitchen needs to be done else the family can’t stay in the same house during the whole process of renovation.
Kitchen renovation is required in the specified location because of its existing old infrastructure. The current kitchen does not accommodate any bar table or chairs which are required by the family if 5 now. Also, there are no equipments and appliances as per need of family. Space i
s less but the requirements to add things is little more which cannot be done in present infrastructure and setup. Thus, there is need to renovate kitchen based on modern yet contemporary model that will help to get all desired amenities in the given small space of 150 square feet.
Project objective
Objectives associated with this project includes-
· Cleaning up of existing infrastructure including interiors and cupboards etc.
· Installation of new infrastructure in given kitchen area of 150 square feet.
· Renovated new kitchen handing over process to the customer.
Project scope
Scope of this kitchen renovation project includes following-
· Demolition of existing infrastructure and cleaning up of mess.
· Installation of new infrastructure and interior.
· Handing over of all new renovated kitchen to client
· Budget scope of project is confined to $25000
· Time deadline to completely handing over the project is October 1, 2020.
Project duration
The whole project from planning to designing followed by demolition and installation to handing over is to be done within timeframe of three months as this is a short term project. This project is to be completed from July to October, 2020.
Starting of project- 1st July, 2020
Ending of Project- 1st October, 2020
Most likely and worst duration is perceived and analyzed for the project activities which is as follows-
    Activity
    Most Likely Duration (Weeks)
    Worst Duration (Weeks)
    Planning
    1
    1.5
    Designing
    1
    2
    demolition
    0.5
    1
    Material procurement and installation
    0.5
    1
    Equipments installation
    2
    3
    Dispose off mess
    0.5
    1
    Safety and evaluation
    0.5
    1
    Painting, flooring and tile work
    3
    5
    Handover
    1
    2
Required resources
A major required resource associated with the project is funding and approval from the owner of house who is also sponsor for the project. Also, there is need to understand the taste and preferences of the family members. Other required resources includes project management team, general contractor including various sub contractor, interior designer, appliances, equipments required, other furniture and construction requirements etc. Apart from these, feedback from the client on timely basis also acts as a resource to conduct and complete the activities as expected by the client.
Perceived Costs
Based on the current market prices of all required resources, it is perceived that the main cost that will cover major project budget will be towards furniture, interiors and the equipments to be used and installed in the renovated modern kitchen. Other cost includes contractor cost, interior designer cost along with project management team cost. Demolition and installation as well as cleaning up cost will also constitute part of cost incurred.
Boundaries of project
Inclusion and exclusion of project- Project boundaries includes several steps of the process which is to make plan, to design the project and interiors required, carrying out the process of demolition, constructing the new infrastructure and interiors. Testing and commission is done followed by clean up and finally handed over to customer.
Project also does have some exclusion, major one is post delivery maintenance of the project handed over.
Project constraints
From the beginning to handover, project is under the project management team. The only constraints of the project are towards the timeline and budget. Also once the handover is done, project management team does not hold any liability towards maintenance of the renovated kitchen. Main constraints are as follows-
· Fixed budget of $25000.
· Time constraint of 3 months.
· Quality constraint and maintenance post handing over.
Perceived Risks
During kitchen renovation in a house, the challenges that are generally encountered are as follows-
· Taste and preference variations among the family members.
· Interior design as per demand.
· Equipment and installation compliance as per requirements.
· Quality outcome at the end of project.
Perceived risks based on the project include financial risk, on site operational risk, time frame risk and risk associated with taste and preference of clients. Financial risk is one of major risk as over budgeting may hamper the satisfaction level of client. Time frame risk may occur due to operational issues and improper management. To mitigate these risks, record keeping system along with time scheduling must be done.
Record keeping system
Keeping a track record of all the activities along with the timelines, progress of activity and its completion deadline helps to mitigate risks and achieve deliverables as and when desired. Record keeping system must be maintained throughout the project process so as to achieve all milestones and deliver a successful project.
    S.No
    Activity
    Progress percentage
    Remark (If any)
    1
    Planning
    
    
    2
    Designing
    
    
    3
    Demolition
    
    
    4
    Clean up
    
    
    5
    Installation
    
    
    6
    Mechanical, electrical, plumbing and other sub activities
    
    
    7
    Flooring, tiling and painting activities
    
    
    8
    Handover
    
    
Stakeholders and their roles/responsibilities
Various people and teams associated with the project who plays vital role in all activities are termed as stakeholders. Major stakeholders of this kitchen renovation project are as follows-
    Stakeholder
    Role
    Involvement
    Priority
    Impact
    Family or household owner
    Funding and sponsoring
    High
    Main
    Positive
    Supplier/vendor
    Supplier
    Medium
    Main
    Positive
    Project manager
    Management
    Very high
    Main
    Very positive
    General contractor
    Process
    Very high
    Main
    Very positive
    Designers
    Designing
    High
    Main
    Positive
Benefits and Project outcomes
· Modern yet renovated contemporary kitchen.
· Spacious with ease...
SOLUTION.PDF

Answer To This Question Is Available To Download

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here