Based on evidence gathered and evaluated, an auditor decides to increase the assessedlevel of control risk from that originally planned. To achieve an overall audit risklevel that is substantially the same as the planned audit risk level, the auditor could(1) decrease detection risk. (3) decrease substantive testing.(2) increase materiality levels. (4) increase inherent risk.