Assignment 1 • A company produces two products A and B, which have profits of $9 and $7, respectively. Each unit of product must be processed on two assembly lines, where the required production times...


PLEASE SOLVE THE FOLLOWING PARTS OF THIS QUESTION IN THE IMAGE.


d) Identify the amount of unused resources (i.e., slack) at ach of the graphical extreme points.


e) What would be the effect on the optimal solution if the production time on line 1 was reduced to 40 hours?


f) What would be the effect on the optimal solution if the profit for product B was increased from $7 to $15? to $20?


Assignment 1<br>• A company produces two products A and B, which<br>have profits of $9 and $7, respectively. Each unit of<br>product must be processed on two assembly lines,<br>where the required production times are as follows<br>Hours/Unit<br>Product<br>Line 2<br>Line 1<br>A<br>12<br>B<br>4<br>Total hours<br>60<br>40<br>Assignment 1 Con't<br>77<br>(a) Formulate a linear programming model to determine<br>the optimal product mix that will maximize profit.<br>(b) Solve Problem graphically.<br>(c) Transform this model into standard form.<br>(d) Identify the amount of unused resources (i.e., slack) at<br>each of the graphical extreme points.<br>(e) What would be the effect on the optimal solution if the<br>production time on line 1 was reduced to 4o hours?<br>(f) What would be the effect on the optimal solution if the<br>profit for product B was increased from $7 to $15? to $20?<br>

Extracted text: Assignment 1 • A company produces two products A and B, which have profits of $9 and $7, respectively. Each unit of product must be processed on two assembly lines, where the required production times are as follows Hours/Unit Product Line 2 Line 1 A 12 B 4 Total hours 60 40 Assignment 1 Con't 77 (a) Formulate a linear programming model to determine the optimal product mix that will maximize profit. (b) Solve Problem graphically. (c) Transform this model into standard form. (d) Identify the amount of unused resources (i.e., slack) at each of the graphical extreme points. (e) What would be the effect on the optimal solution if the production time on line 1 was reduced to 4o hours? (f) What would be the effect on the optimal solution if the profit for product B was increased from $7 to $15? to $20?

Jun 04, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here