Extracted text: An embankment is to be constructed at a 5% moisture content. Material will be placed at the rate of 300 ccy/hr. The specified dry weight of the compacted fill is 2,700 lb/ccy. How many Ibs of water must be dried each hour to decrease the moisture content of the material from 20% to 5% by weight?