SCR Annex A Risk Log FHA (A)(B)(C)(D)(E)(H)(I)(J)(K)(L)(M) (A)(N)(O)(P)(Q) (A)(R)(S) (T)(U)(Y)(Z)(X) ID #Function Identification Functional Assessment Hazard Description (for...

1 answer below »

All the above scenarios’ has to update into an Excel Sheet which has been submitted to you as an additional proof/example. In that provided excel sheet has some pre-descripted examples with respect to some cases, just follow/use them as a reference to update the above following scenarios’ 1-7.




SCR Annex A Risk Log FHA (A)(B)(C)(D)(E)(H)(I)(J)(K)(L)(M)(A)(N)(O)(P)(Q)(A)(R)(S)(T)(U)(Y)(Z)(X) ID #Function IdentificationFunctional AssessmentHazard Description (for safety significant functions)Casual FactorRisk SubstantiationRisk CategoryInitial RiskHRIEnduring Mitigations (To eliminate or minimise the risk)Mitigation ResponsibilityPlanned Applied By DateResidual Risk (SFARP)HRIInterim Mitigations (As required, to eliminate or minimise the risk)Risk Level with Applied Interim Mitigations (SFARP)Design DisclosureVerificationHuman Impact FactorsSocial Impact FactorsComments FunctionSub-FunctionFunctional FailurePhase/s Safety Significant Function?LikelihoodConsequenceRisk LevelLikelihoodConsequenceRisk LevelLikelihoodConsequenceRisk Level 1ElectricalSafety componentsOther components stop workingOperational - UnattendedYesElectrical components purchased are of low quality leading to failure of critical electrical systemsLack of understanding of manufacturing process Counterfeit Parts used in manufacturing Lack of supply chain managementPrevious suppliers in this sector have provided counterfeit parts Safety reports issued on previous accidents / failuresPerformanceProbableCatastrophicVery HighE41. Elimination - Redundant Systems - Procure higher quality parts 2. Substitution - - 3. Isolation - - 4. Engineering Controls - - 5. Administrative Controls - - 6. PPEElectrical EngineersEnd of Week 2ImprobableCatastrophicMediumE21. Elimination - - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - - 5. Administrative Controls - Response processes upon failure detection - 6. PPE - - ImprobableMajorLowShop Drawings Procedures Design DocumentsAuditing Inspections TestingFatalities Family Public Perception Reputation of business and employees 2MechanicalDiesel PlantDiesel Shut off systems fail to activateOperational - Unattended, Maintenance Shutdown - AttendedYesAutomated diesel generator systems fail to activate on the disesl generators upon shutdown command being passed from operator. Lack of understanding of shutdown process Lack of system failure alerting Lack of detail in safeguards to system designPrevious notifications and defect alerts from supplier of automated systems Previous experience from designers and operatorsPerformanceOccasionalModerateLowB31. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - Engineer in a failsafe system to ensure the diesel systems shut down upon command - 5. Administrative Controls - - 6. PPEEngineeringEnd of Week 2ImprobableModerateVery LowB21. Elimination - - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - - 5. Administrative Controls - Response processes upon failure detection - 6. PPE - - ImprobableMinorVery LowDetailed Design Documentation Procedures Testing Auditing Operational TestingOperator injuryOperator Morale and confidence in the delivered system 3ConstructionScaffoldingConstruction scaffolding fails and causes collapse with construction operators Operational - UnattendedYesScaffolding joins fail upon use past their inspection date and can cause collapse of scaffolding system. Resulting in fall from heights greater then 2.0mUse of out of date and out of inspection equipmentInspection reports suggesting prior use of equipment out of inspection dateSafetyImprobableCriticalMediumD21. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - Engineer in a failsafe system to ensure the diesel systems shut down upon command - 5. Administrative Controls - - 6. PPESite Safety Officer Site Inspection OfficerEnd of Week 2RareMajorVery LowC11. Elimination - Utilisation of equipment that is in inspection date and serviceable 2. Substitution - - 3. Isolation - - 4. Engineering Controls - - 5. Administrative Controls - - 6. PPERareModerateVery LowTest and Inspection Log / Reports Development of inspection process Planned Maintenance ProceduresTesting InspectionFalls resulting in injury to workers and surrounding personnel Reputation of business is damaged 4Physical SecuritySite SecurityCriminal opportunity. Criminals obtain access to the worksite and theft of tools and equipment is experiencedOperational - Unattended, Maintenance Operational - Attended, Maintenance Shutdown - AttendedNoPhysical Security of the site not sufficientSecurity reports Criminal intelligence reports from local police and securityPerformanceOccasionalModerateLowB31. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - Implement Security monitoring system and fencing to protect the site - 5. Administrative Controls - Implement security procedures to guard and protect the work site 24/7 - 6. PPESite ManagerEnd of Week 2ImprobableMajorLowC21. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - 5. Administrative Controls - Implement security guards as a temporary measure until firmer security controls are implemented - 6. PPEImprobableMajorLowSite security and safety design Site Security protocolsInspection Morale impacted Productivity impacted Delays experiencedSite and company reputation impacted 5Site SecurityThreat from ProtestorsProtestors block the main entry and exit gates to the worksiteOperational - Unattended, Maintenance Operational - Attended, Maintenance Shutdown - AttendedNoProtestors and Issue Motivated Groups intent on disrupting the work site and operationsSecurity reports Criminal intelligence reports from local police and securityPerformanceImprobableMajorLowC21. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - Security system and Fencing - Security Guards - CCTV 5. Administrative Controls - Security protocols - Community engagement protocols and activities 6. PPESite Safety and Security Manager Site Manager End of Week 2 ERROR:#N/ANo residual risk identified until end of week 2 implementation Security operating processes Site security design documentsInspection Decreased morale of staff Work time lost Reputational DamageBusiness reputational damage Staff reputational damage Community discouragement Industry discouragement 6GovernmentalExternal influencersDe-scope or halting the projectNoChange of Government during project resulting in de-prioritising the programChange of Government Change of public opinion of the projectReports from Federal, State and Local Government Reports from end customerEnvironmentImprobableCriticalMediumD21. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - - 5. Administrative Controls - Implement management and monitoring through regular engagement - 6. PPEExecutive Management Project Management Business ManagementEnd of Week 2 ERROR:#N/ANo Residual risk identified Project Status reporting Inspection of reports Loss of sustained employment for staff Degrade morale of staffLoss of economical gain for local community 7Human EngineeringEnvironmental Management SystemEnvironmental management system designOperational - UnattendedYesPoor design in Submarine environmental sustainment systems resulting in lower than expected endurance and higher long term risk to operator health Poor design process System engineering process not followed Initial Statement of Requirements not followed or defined High level design not correctReports from previous designs and lessons learntSafetyProbableCatastrophicVery HighE41. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - Engineer a robust design in the Environmental Monitoring and Management system - 5. Administrative Controls - - 6. PPEDesign EngineersEnd of Week 4ImprobableCriticalMediumD21. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - - 5. Administrative Controls - Implement strict peer review process - Implement Documentation review and analysis of design 6. PPEImprobableCriticalMediumDesign Documents Engineering Management PlanInspection TestingSignificant impact on operators if poor design is implemented short and long termReputation of business is damaged Trust of customer is damaged 8ICT SystemsOnboard ICT Networking systemICT Network failure preventing systems from communicating and passing commandsOperational - UnattendedYesICT Network infrastructure installed on the submarine constantly fails which prevents reliant systems from communicating. This also causes additional systems from functioning correctlyPoor network design Poor requirement definition Poor network componentsPrevious Submarine design reports Previous operator statements of accountSafetyOccasionalCriticalHighD31. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - Design a network that is robust and has an availability of over 99.98% - 5. Administrative Controls - - 6. PPEICT Designers Electrical EngineersEnd of Week 3 ERROR:#N/ANo residual risk identified 9Hull PreservationPreparation and primingExposure to chemicalsOperational - UnattendedYesPreparation chemicals used in the submarine painting process pose a significant personnel, environmental and ozone risk if used incorrectly causing permanent injury with a high probability of exposed workers contracting cancerous diseases after prolonged use and exposure. ERROR:#N/A1. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - - 5. Administrative Controls - - 6. PPE ERROR:#N/A1. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - 5. Administrative Controls - - 6. PPE 10Structural SystemHull SystemImplosion of hullOperational - UnattendedYesForged steel for submarine hull has been found to potentially develop microscopic stress fractures leading to decreased operating ability and potential catastrophic destruction of the submarine if operated within normal operating limitationsPoor design process System engineering process not followed Initial Statement of Requirements not followed or defined High level design not correctPrevious design reports on similar systems Previous reports on metal fatigueSafetyImprobableCatastrophicMediumE21. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - - 5. Administrative Controls - - 6. PPE ERROR:#N/A1. Elimination - 2. Substitution - - 3. Isolation - - 4. Engineering Controls - 5. Administrative Controls - - 6. PPE ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A ERROR:#N/A CLASSIFICATIONAnnex A to Safety Case Report/Technical Risk Assessment &8SOP (LSD) 12-0-110 TP03 v3.0CLASSIFICATION Page &P of &NObjective File Reference Modems-IF (A)(B)(C)(D)(E)(F)(G)(H)(I) Hazard IDHazard DescriptionEffect of HazardRisk AssessmentRecommended Actions - HIRAC (Enduring mitigations to achieve SFARP and interim mitigation if required)Actions Applied By Who:Actions Applied By Date:Effect of Recommeded ActionsStatus Risk SubstantiationLikelihoodConsequenceRiskHRIIs the Risk assessed as SFARP when ALL Mitigations Agreed have been implemented?Residual Risk (SFARP)Concession or OtherDescription of Risk at Date of Signature LikelihoodConsequenceRiskHRI MS-001Environmental impactEnvironmental ImpactThe likelihood is XXX because: - - Consequence is assessed as XXX due: - - Red Team: Red Team: - Comment is place holder needs to be udpated. - Current information in orginal Phar table and AECOM report is defficient is documenation risk substantationUnlikely Red Team: Red Team: These are assumptions only to derive the risk as identified in the AECOM Chair 1 report. No Likelihood and Consequence data was provided in the reportModerate Red Team: Red Team: These are assumptions only to derive the risk as identified in the AECOM Chair 1 report. No Likelihood and Consequence data was provided in the reportERROR:#REF!ERROR:#REF!Fuel room, fill point & generator plant to be bunded - consider bunding to meet standards. Consider requirements for pipework to mitigate risk of leakage. Small pipework distance. Note diesel pipework above ground - consider trip hazards, access, maintainability etcYesUnlikelyMinorERROR:#REF!ERROR:#REF!Implementation of the identified actions means the risk is reduced to XXX The consequence remains as XXX. Other considerations: - - - Red Team: Red Team: - Comment is place holder needs to be udpated, inncluding summary of other consideration as per the DID Red Team: Red Team: - Comment is place holder needs to be udpated. - Current information in orginal Phar table and AECOM report is defficient is documenation risk substantation Red Team: Red Team: These are assumptions only to derive the risk as identified in the AECOM Chair 1 report. No Likelihood and Consequence data was provided in the report Red Team: Red Team: These are assumptions only to derive the risk as identified in the AECOM Chair 1 report. No Likelihood and Consequence data was provided in the reportOpen Subsystem Key MR - FDMA EBEM Modem Racks
Answered Same DaySep 05, 2021CMM92001Southern Cross University

Answer To: SCR Annex A Risk Log FHA (A)(B)(C)(D)(E)(H)(I)(J)(K)(L)(M) (A)(N)(O)(P)(Q) (A)(R)(S)...

Guneet answered on Sep 07 2021
145 Votes
SCR Annex A Risk Log
FHA
        (A)    (B)    (C)    (D)    (E)    (H)    (I)    (J)    (K)    (L)    (M)            (A)    (N)    (O)    (P)    (Q)            (A)    (R)    (S)            (T)    (U)    (Y)    (Z)    (X)
        ID #    Function Identification        Functional Assessment            Hazard Description
(for safety significant functions)    Casual
Factor    Risk Substantiation    Risk Category    Initial Risk            HRI    Enduring Mitigations
(To eliminate or minimise the risk)    Mitigation Responsibility    Planned Applied By Date    Residual Risk
(SFARP)            HRI    Interim Mitigations
(As required, to eliminate or minimise the risk)    Risk Level with Applied Interim Mitigations
(SFARP)            Design
Disclosure    Verification    Human Impact Factors    Social Impact Factors    Comments
            Function    Sub-Function    Functional
Failure    Phase/s
    Safety Significant Function?                    Likelihood    Consequence    Risk Level                    Likelihood    Consequence    Risk Level            Likelihood    Consequence    Risk Level
        1    Electrical    Safety components    The Original design requirements
of Electrical Control Systems were not clearly set out     Operational - Unattended,
Maintenance Operational - Attended    No    Highly complex systems and the design requirements can be deterrent if wrongly implemented.    Lack of clarity of previous electrical systems urged need for implementing new Artificial Intelligence Safety System.     A team of 6 Elelctrical engineers employed to provide design input of submarines new electrical control systems, for which a meeting with head engineer will be organized to clarify overall system requirements.    Performance    Probable    Catastrophic    Very High    E4    1. Elimination
- Redundant Systems
2. Substitution
- New Artificial Intelligence system
- New Control System Designing
3. Isolation
-
-
4. Engineering Controls
- New engineers deployment
- Simplify the systems
5. Administrative Controls
-
-
6. PPE    Electrical Engineers    End of Week 2    Improbable    Catastrophic    Medium    E2    1. Elimination
-
-
2. Substitution
-
-
3. Isolation
-
-
4. Engineering Controls
-
-
5. Administrative Controls
- Response processes upon failure detection
-
6. PPE
-
-     Improbable    Major    Low    Electrical control
Procedures
Design Documents    Auditing
Inspections
Testing    Fatalities
    Family
Public Perception
Reputation of business and employees
        2    Mechanical    Diesel Plant    Issue with Diesel generators, not working properly.    Operational - Unattended,
Maintenance Operational - Attended,
Maintenance Shutdown - Attended    Yes    Issues with the new diesel generators being installed on board the submarines and require full removal for rectification    Lack of repair leading to shutdown process
Fully installed in 2 submarines and the hulls have been welded.
In remaining 8 submarines in line for installation.    Issue raised by Mechanical engineers for the faulty installed generators.
Previous experience from designers and operators    Performance    Occasional    Moderate    Low    B3    1. Elimination
- New diesel generators need removal
2. Substitution
- installed generators rectified with new ones
-
3. Isolation
-
-
4. Engineering Controls
- Continuous repair
- Proper designing required
5. Administrative Controls
-
-
6. PPE-Keep regular checks    Engineering    End of Week 9    Improbable    Moderate    Very Low    B2    1. Elimination
-
-
2. Substitution
-
-
3. Isolation
-
-
4. Engineering Controls
-
-
5. Administrative Controls
- Response processes upon failure detection
-
6. PPE
-
-     Improbable    Minor    Very Low    Detailed Design Documentation
Procedures
    Testing
Auditing
Operational Testing    Operator injury    Operator Morale and confidence in the delivered system
        3    Construction    Mid flight project shifting    During construction an Electrical Fire broke out in the main electrical component Room of submarine    Operational - Unattended,
Maintenance Operational - Attended    Yes    Severe Injury to five electrical technicians and the Electrical Engineering Supervisor    Lack of understanding of electrical systems components quality during initial system intregration testing. Counterfeit electrical components were installed into the electrical systems    Previous suppliers in this sector have provided counterfeit parts
Investigation into the incident revealed Faulty electrical components installation.    Safety    Improbable    Critical    Medium    D2    1. Elimination
- Removal of counterfeit Parts
2. Substitution
-
-
3. Isolation
-
-
4. Engineering Controls
- Inderstanding of electrical control systems
-
5. Administrative Controls
- Regular system testing
-
6. PPE    Electrical SUpervisor
Technician    End of Week 2    Rare    Major    Very Low    C1    1. Elimination
- Utilisation of equipment that is in inspection date and serviceable
2. Substitution
-
-
3. Isolation
-
-
4. Engineering Controls
-
-
5. Administrative Controls
-
-
6. PPE    Rare    Moderate    Very Low    Test and Inspection Log / Reports
Development of inspection process
Planned Maintenance Procedures    Testing
Inspection    Falls resulting in injury to Supervisors, workers and surrounding personnel
    Reputation of business is damaged
        4    Physical Security    Site Security    Pre-Fabricated Material for hull and platform construction resulting in heavy equipment shfting and testing    Operational - Unattended    Yes    The already built in modular sections require a large amount of heavy lifting equipment, welding specialists, and metal testing professionals. Security Threats posing serious risk     Use of previously ordered equipment which requires proper handling and its installation is a time consuming process.    Advised by security manager about possible threats and online protests.     Safety    Occasional    Moderate    Low    B3    1. Elimination
-
2. Substitution
-
-
3. Isolation
-
-
4. Engineering Controls
- Implement Security monitoring system and fencing to protect the site
-
5. Administrative Controls
- Implement security procedures to guard and protect the work site 24/7
-
6. PPE    Site Manager    End of Week 2    Improbable    Major    Low    C2    1. Elimination
-
2. Substitution
-
-
3. Isolation
-
-
4. Engineering Controls
-
5. Administrative Controls
- Implement security guards as a temporary measure until firmer security controls are implemented
-
6. PPE    Improbable    Major    Low    Site security and safety design
Site Security protocols    Inspection
    Morale impacted
Productivity impacted
Delays experienced    Site and company reputation impacted
        5    Site Security    Threat from Protestors    Protestors aiming to block the operations and work at site    Operational - Unattended,
Maintenance Operational - Attended,
Maintenance Shutdown - Attended    No    Damage of Property and business functions    Protestors intend on disrupting the work at site and operations    Advised by Security manager
Targeted protests posted online, however no information relating to date and time mentioned.     Safety    Improbable    Major    Low    C2    1. Elimination
-
2. Substitution
-
-
3. Isolation
-
-
4. Engineering Controls
- Security system and Fencing
- Security Guards
- CCTV
5. Administrative Controls
- Security protocols
- Community engagement protocols and activities
6. PPE    Site Safety and Security Manager
Site Manager     End of Week 2    Improbable    Minor    Very Low    A2    No residual risk identified until end of week 2 implementation                 Security operating processes
Site security design documents    Inspection
    Decreased morale of staff
Work time lost
Reputational Damage    Business reputational damage
Staff reputational damage
Community discouragement
Industry discouragement
        6    Governmental    External influencers    De-scope the build of last 3 submarines. Governmental pressure to employ local unskilled people resulting in extra cost and time consumption.     Operational-Attended    No    Change of Government during mid-project resulted in project schedule cut by 25% and loss of $ 12 billion contracts. Hiring of not appropriately skilled people for the project viable.    Change of Government from highly supportive Liberal government to Nation first Environmental Government.
Change of Government opinion of the project. Pressure from Local government officials.    Recent Federal elections resulted in change of Government.
Reports of project review undertaken by the new government resulted in descoping. Business HR delegates decide to hire additional local staff to work in Trade and Technical Roles.    Environment    Improbable    Critical    Medium    D2    1. Elimination
-
2. Substitution
-
-
3. Isolation
-
-
4. Engineering Controls
-
-
5. Administrative Controls
- Implement management and monitoring through regular engagement
-
6. PPE    Executive Management
Project Management
Business Management    End of Week 2    Improbable    Minor    Very Low    A2    No Residual risk identified                 Project Status reporting
    Inspection of reports
    Loss of sustained employment for staff
Degrade morale of staff    Loss of economical gain for local community
        7    Human Engineering    Environmental Management System    Environmental management system performance testing and procurement not complete    Operational - Unattended    Yes    Desalanation systems have not yet been fully tested in the local region and no surity of the performance of these systems when used in different climatic conditions    Poor performance of Desalanation System could result in damage due to human engineering...