Actual Number of Deviations Found Sample Size 1 2 3 4 5 6 7 8. 10 25 11.3 17.6 * * 30 9.5 14.9 19.6 * * * * 35 8.3 12.9 17.0 * * * * * * * 40 7.3 11.4 15.0 18.3 * * * * * 45 6.5 10.2 13.4 16.4 19.2 *...



Use Figure 9.5 to determine the achieved upper deviation rate and the above table to determine the assessed level of control risk under the following circumstances. Assume that the sample size was 75 items.(Round your answers to 1 decimal place.)



Answer is not 13.6% for the last one


Actual Number of Deviations Found<br>Sample<br>Size<br>1<br>2<br>3<br>4<br>5<br>6<br>7<br>8.<br>10<br>25<br>11.3<br>17.6<br>*<br>*<br>30<br>9.5<br>14.9<br>19.6<br>*<br>*<br>*<br>*<br>35<br>8.3<br>12.9<br>17.0<br>*<br>*<br>*<br>*<br>*<br>*<br>*<br>40<br>7.3<br>11.4<br>15.0<br>18.3<br>*<br>*<br>*<br>*<br>*<br>45<br>6.5<br>10.2<br>13.4<br>16.4<br>19.2<br>*<br>*<br>*<br>50<br>5.9<br>9.2<br>12.1<br>14.8<br>17.4<br>19.9<br>*<br>55<br>5.4<br>8.4<br>11.1<br>13.5<br>15.9<br>18.2<br>*<br>*<br>*<br>60<br>4.9<br>7.7<br>10.2<br>12.5<br>14.7<br>16.8<br>18.8<br>*<br>*<br>*<br>*<br>65<br>4.6<br>7.1<br>9.4<br>11.5<br>13.6<br>15.5<br>17.4<br>19.3<br>*<br>*<br>70<br>4.2<br>6.6<br>8.8<br>10.8<br>12.6<br>14.5<br>16.3<br>18.0<br>19.7<br>*<br>*<br>75<br>4.0<br>6.2<br>8.2<br>10.1<br>11.8<br>13.6<br>15.2<br>16.9<br>18.5<br>20.0<br>80<br>3.7<br>5.8<br>7.7<br>9.5<br>11.1<br>12.7<br>14.3<br>15.9<br>17.4<br>18.9<br>*<br>90<br>3.3<br>5.2<br>6.9<br>8.4<br>9.9<br>11.4<br>12.8<br>14.2<br>15.5<br>16.8<br>18.2<br>100<br>3.0<br>4.7<br>6.2<br>7.6<br>9.0<br>10.3<br>11.5<br>12.8<br>14.0<br>15.2<br>16.4<br>125<br>2.4<br>3.8<br>5.0<br>6.1<br>7.2<br>8.3<br>9.3<br>10.3<br>11.3<br>12.3<br>13.2<br>150<br>2.0<br>3.2<br>4.2<br>5.1<br>6.0<br>6.9<br>7.8<br>8.6<br>9.5<br>10.3<br>11.1<br>200<br>1.5<br>2.4<br>3.2<br>3.9<br>4.6<br>5.2<br>5.9<br>6.5<br>7.2<br>7.8<br>8.4<br>

Extracted text: Actual Number of Deviations Found Sample Size 1 2 3 4 5 6 7 8. 10 25 11.3 17.6 * * 30 9.5 14.9 19.6 * * * * 35 8.3 12.9 17.0 * * * * * * * 40 7.3 11.4 15.0 18.3 * * * * * 45 6.5 10.2 13.4 16.4 19.2 * * * 50 5.9 9.2 12.1 14.8 17.4 19.9 * 55 5.4 8.4 11.1 13.5 15.9 18.2 * * * 60 4.9 7.7 10.2 12.5 14.7 16.8 18.8 * * * * 65 4.6 7.1 9.4 11.5 13.6 15.5 17.4 19.3 * * 70 4.2 6.6 8.8 10.8 12.6 14.5 16.3 18.0 19.7 * * 75 4.0 6.2 8.2 10.1 11.8 13.6 15.2 16.9 18.5 20.0 80 3.7 5.8 7.7 9.5 11.1 12.7 14.3 15.9 17.4 18.9 * 90 3.3 5.2 6.9 8.4 9.9 11.4 12.8 14.2 15.5 16.8 18.2 100 3.0 4.7 6.2 7.6 9.0 10.3 11.5 12.8 14.0 15.2 16.4 125 2.4 3.8 5.0 6.1 7.2 8.3 9.3 10.3 11.3 12.3 13.2 150 2.0 3.2 4.2 5.1 6.0 6.9 7.8 8.6 9.5 10.3 11.1 200 1.5 2.4 3.2 3.9 4.6 5.2 5.9 6.5 7.2 7.8 8.4
c. Use Figure 9.5 to determine the achieved upper deviation rate and the above table to determine the assessed level of control risk<br>under the following circumstances. Assume that the sample size was 75 items. (Round your answers to 1 decimal place.)<br>Achieved Upper<br>Deviation Rate<br>Assessed Level of<br>Circumstance<br>Control Risk<br>No deviations were included in the sample.<br>%<br>Low<br>One deviation is included in the sample.<br>%<br>Low<br>Eight deviations were included in the sample.<br>%<br>Slightly below the maximum<br>

Extracted text: c. Use Figure 9.5 to determine the achieved upper deviation rate and the above table to determine the assessed level of control risk under the following circumstances. Assume that the sample size was 75 items. (Round your answers to 1 decimal place.) Achieved Upper Deviation Rate Assessed Level of Circumstance Control Risk No deviations were included in the sample. % Low One deviation is included in the sample. % Low Eight deviations were included in the sample. % Slightly below the maximum
Jun 10, 2022