Ace Manufacturing produces 1,000 hammers per day. The total fixed cost for the plant is $5,000 per day, and the total variable cost is $15,000 per day. Calculate the average fixed cost, average...


Ace Manufacturing produces 1,000 hammers per day.  The total fixed cost for the plant is $5,000 per day, and the total variable cost is $15,000 per day.  Calculate the average fixed cost, average variable cost, and average total cost, and total cost at the current output level.