A1 m-diameter pipe bend shown in the diagram is carrying crude oil (S= 0.94) with a steady flow rate of 2 m3/s. The bend has an angle of 30° and lies in a horizontal plane. The volume of oil in the...


A1 m-diameter pipe bend shown in the diagram is carrying crude oil (S= 0.94) with a<br>steady flow rate of 2 m3/s. The bend has an angle of 30° and lies in a horizontal plane.<br>The volume of oil in the bend is 1.2 m3, and the empty weight of the bend is 4 kN.<br>Assume the pressure along the centerline of the bend is constant with a value of 75 kPa<br>gage. Find the net force required to hold the bend in place.<br>Bolted flange<br>Flow<br>30<br>

Extracted text: A1 m-diameter pipe bend shown in the diagram is carrying crude oil (S= 0.94) with a steady flow rate of 2 m3/s. The bend has an angle of 30° and lies in a horizontal plane. The volume of oil in the bend is 1.2 m3, and the empty weight of the bend is 4 kN. Assume the pressure along the centerline of the bend is constant with a value of 75 kPa gage. Find the net force required to hold the bend in place. Bolted flange Flow 30

Jun 11, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers