Extracted text: A soil sample was taken from the ground of a project after it has been compacted by a contractor, the data of the soil sample are: (w=13.6%, Gs=2.78, yfield=19.4 kN/m3) if the specifications of the compaction require the maximum porosity is (40%) Did the contractor achieve the specification? (explain the reason)