A single machine is designed to produce three parts (A, B, and C). Each part will have its own independent arrival pattern but all parts will follow a UNIF(12, 40) min. The processing for parts are...

Choose the correct options
A single machine is designed to produce three parts (A, B, and C). Each part will have its own independent arrival pattern but all<br>parts will follow a UNIF(12, 40) min. The processing for parts are Expo(3), Expo(6), and Expo(12) for parts A, B, and C respectively.<br>After each part is processed, there is a chance that the part needs to be reworked, rework probability is 10%. When the parts go<br>back to the machine for reprocessing, they all will require TRIA(1,9,15) min. Before sending a part for rework, if the number of parts<br>waiting in the queue in front of the machine is greater than 5, all parts will be send to a secondary machine (outside the bounds of<br>this model) and get processed there. Run the 10 replications of the system for 20 days, (24 hours/day). All units are in minutes.<br>SELECT THE CORRECT ANSWERS ONLY:<br>A) The waiting time for part types A is not different from B<br>B The waiting time at the single machine is less than 20 min<br>The utilization for the machine is higher than 80% but lesser than 85%.<br>The average number of parts leaving the system for the second machine is more than 55 parts<br>(E The system's throughput is more than 180 parts per day<br>F The minimum number of

Extracted text: A single machine is designed to produce three parts (A, B, and C). Each part will have its own independent arrival pattern but all parts will follow a UNIF(12, 40) min. The processing for parts are Expo(3), Expo(6), and Expo(12) for parts A, B, and C respectively. After each part is processed, there is a chance that the part needs to be reworked, rework probability is 10%. When the parts go back to the machine for reprocessing, they all will require TRIA(1,9,15) min. Before sending a part for rework, if the number of parts waiting in the queue in front of the machine is greater than 5, all parts will be send to a secondary machine (outside the bounds of this model) and get processed there. Run the 10 replications of the system for 20 days, (24 hours/day). All units are in minutes. SELECT THE CORRECT ANSWERS ONLY: A) The waiting time for part types A is not different from B B The waiting time at the single machine is less than 20 min The utilization for the machine is higher than 80% but lesser than 85%. The average number of parts leaving the system for the second machine is more than 55 parts (E The system's throughput is more than 180 parts per day F The minimum number of "Assign Modules" needed to create this model is 4 G) The maximum number of times a part goes through rework is between 4-5 times H The total time (regardless of the part type) is about 37 minutes

Jun 09, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »