A proposed nuclear power plant will cost $2.7 billion to build and then will produce cash flows of $350 million a year for 15 years. After that period (in year 15), it must be decommissioned at a cost...


A proposed nuclear power plant will cost $2.7 billion to build and then will produce cash flows of $350 million a year for 15 years. After that period (in year 15), it must be decommissioned at a cost of $950 million.



a.What is the NPV of the project if the discount rate is 3%?



b.What is the NPV of the project if the discount rate is 16%?