A project is being considered by the Tennessee Department of Transportation to replace an aging bridge across the Cumberland River on a state highway. The existing two-lane bridge is expensive to...


A project is being considered by the Tennessee Department of Transportation to<br>replace an aging bridge across the Cumberland River on a state highway. The<br>existing two-lane bridge is expensive to maintain and creates a traffic bottleneck<br>because the state highway is four lanes wide on either side of the bridge. The<br>new bridge can be constructed at a cost of $300,000, and estimated annual<br>maintenance costs are $10,000. The existing bridge has annual maintenance costs<br>of $18,500. The annual benefit of the new four-lane bridge to motorists, due to<br>the removal of the traffic bottleneck, has been estimated to be $25,000. Conduct a<br>B-C analysis, using a MARR of 8% and a study period of 25 years, to determine<br>whether the new bridge should be constructed.<br>

Extracted text: A project is being considered by the Tennessee Department of Transportation to replace an aging bridge across the Cumberland River on a state highway. The existing two-lane bridge is expensive to maintain and creates a traffic bottleneck because the state highway is four lanes wide on either side of the bridge. The new bridge can be constructed at a cost of $300,000, and estimated annual maintenance costs are $10,000. The existing bridge has annual maintenance costs of $18,500. The annual benefit of the new four-lane bridge to motorists, due to the removal of the traffic bottleneck, has been estimated to be $25,000. Conduct a B-C analysis, using a MARR of 8% and a study period of 25 years, to determine whether the new bridge should be constructed.

Jun 04, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here