A product requires 32 distinct steps to manufacture, with a total work content of 67 minutes. Demand for the product requires that the single assembly line must produce one unit every 6 minutes. If it is possible to balance the line using the theoretical minimum number of workstations, what level of throughput efficiency (TE) will be achieved?
A) 100% TEB) between 95.9% TE and 99.9% TEC) between 93.9% TE and 95.8% TED) between 91.9% TE and 93.8% TEE) less than 91.9% TE