A process for making steel pipe is under control if the diameter of the pipe has a mean of 3.0000 inches with a standard deviation of 0.0250 inch. To check whether the process is under control, a...

Fast correct pls
A process for making steel pipe is under control if the diameter of the pipe has a mean of 3.0000 inches<br>with a standard deviation of 0.0250 inch. To check whether the process is under control, a random<br>sample of size n = 30 is taken each day and the null hypothesis u= 3.0000 is rejected if X is less than<br>2.9960 or greater than 3.0040.<br>(b) Find the probability of Type-1 error (a).<br>(c) Find the probability of type-Il error (B) when u= 3.0050 inches.<br>

Extracted text: A process for making steel pipe is under control if the diameter of the pipe has a mean of 3.0000 inches with a standard deviation of 0.0250 inch. To check whether the process is under control, a random sample of size n = 30 is taken each day and the null hypothesis u= 3.0000 is rejected if X is less than 2.9960 or greater than 3.0040. (b) Find the probability of Type-1 error (a). (c) Find the probability of type-Il error (B) when u= 3.0050 inches.

Jun 11, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here