A pharmaceutical company manufactures two drugs at Los Angeles and Indianapolis. The cost of manufacturing a pound of each drug depends on the location, as indicated in the file P03_42.xlsx. The machine time (in hours) required to produce a pound of each drug at each city is also shown in this table. The company must produce at least 1000 pounds per week of drug 1 and at least 2000 pounds per week of drug 2. It has 500 hours per week of machine time at Indianapolis and 400 hours per week at Los Angeles.
a. Determine how the company can minimize the cost of producing the required drugs.
b. Use SolverTable to determine how much the company would be willing to pay to purchase a combination of A extra hours of machine time at Indianapolis and B extra hours of machine time at Los Angeles, where A and B can be any positive multiples of 10 up to 50.