A: One of the concrete plants produce 2000 pieces per day at a cost (200) I.Q.D per piece, mean thickness of the piece is 70 mm & standard deviation is 4 mm. The acceptable production is (I + 2.5 S )....


A: One of the concrete plants produce 2000 pieces per day at a cost (200) I.Q.D per piece, mean thickness of<br>the piece is 70 mm & standard deviation is 4 mm. The acceptable production is (I + 2.5 S ). Find the<br>following?<br>1. The loss of production because the failed production..<br>2. Amount of production for (X±3 S) ...<br>

Extracted text: A: One of the concrete plants produce 2000 pieces per day at a cost (200) I.Q.D per piece, mean thickness of the piece is 70 mm & standard deviation is 4 mm. The acceptable production is (I + 2.5 S ). Find the following? 1. The loss of production because the failed production.. 2. Amount of production for (X±3 S) ...