A new generation of wind turbine is under development. The plan envisions land-based turbines with a rated power of 4 MW and a diameter of 125 m (about the same as the London Eye, one of the world’s largest Ferris wheels). One turbine requires 410 metric tons of materials and construction consumes an energy of 2
 107
MJ. The anticipated capacity factor, C, is 0.3.


(a) What are the nominal material and energy intensities of the new turbines? How do these compare with the values for existing land-based turbines in Table 12.2?


(b) What is the expected energy payback time?