A manufacturing plant receives orders for customized mechanical parts. The orders vary in size, from about 30 to 130 units. After configuring the production line, a supervisor oversees the production. The scatterplot in Figure 5 plots the production time (in hours) versus the number of units for 45 orders.
The least squares regression line in the scatterplot (Figure 5) is
Production Time (Hours) = 2.1 + 0.031 Number of Units
a. Interpret the intercept of the estimated line. Is the intercept visible in Figure 5?4
b. Interpret the slope of the estimated line.5
c. Using the fitted line, estimate the amount of time needed for an order with 100 units. Is this estimate an extrapolation?6
d. Based on the fitted line, how much more time does an order with 100 units require over an order with 50 units?7