A cooling tower works with the amount of cooling water 1 ton/hour. Conditions of cooling water in the cooling tower has a solid content of 1350 ppm. The cooling water entering the cooling tower is processed in such a way that the solids content is a maximum of 225 ppm. If the cooling water evaporated rate is assumed to be 2.5% the cooling water inlet rate, calculate the concentration cycle, the added water rate, and the blowdown water rate!