Extracted text: 9. RISE AND FALL METHOD. Given schematic ar- rangement of lines for a 1evel route run from BM-1 to BM-2 in which intermediate foresights to a number of points have It is desired to determine the elevation of below is the been observed. BM-2 also the elevations of the and complete an appropriate format of level and intervening points. Prepare for notes the portrayed information using the Also show the rise and method check. fall arithmetic of leveling. customary k OM - 1 Elov = 362.45m CP, 2.058 (IFS) 2.363 0.899 (FS) · 1.765 (BS) (BS) 3.519 (IFS) 1.776--0h 2.305 (IFS) -oi - 2.335 (IFS) 2.168 (IFS) 1.763 (IFS) BM-2 (Unknown Elov) CP2 EQ (S) 010 1.541 (IFS) 2,695 (FS) 1.022 IFS) (BS) 2.986 1.128 (IFS) (IFS) 3.280 (FS) 0.663 (IFS) 00-L234 (IFS) 3.229 (IFS) IFS) 1.784