8.Match the List 1 to List 2 and choose the correct option.


1. Requirement Elicitation ------- a. Module Development and integration.
2. Design------------------------------b. Analysis
3. Implementation------------------c. Structure and behavioral
4. Maintenance --------------------- d. Performance tuning.
a.1-c , 2-a , 3-d , 4-b
b.1-c , 2-a , 3-b , 4-d
c.1-a , 2-c , 3-d , 4-b
d.1-b , 2-c , 3-a , 4-d