72. The process mean and process target are never the same. True False 73. Process means are determined by the capability of the process itself and not by the positions of the LCL and UCL. True False...






72.
The process mean and process target are never the same.


True
False



73.
















Process means are determined by the capability of the process itself and not by the positions of the LCL and UCL.





True





False








74.




Which statistical tool is used to gain insight into the extent of a relationship between two or more variables.





ANOVA





Two Sample t Test





Regression





One Sample Sign








75.




When a sample size increases the Standard Error of the Mean decreases.





True





False








76.




The ability of a process to meet customer service levels is called ___________.





Outcome Management





Process Readiness





Process Capability





Quality Effectiveness Rating








77.




Whenever a process is designed - regardless of industry or functional area within a business, regardless of whether it is in health care or manufacturing - a Six-Sigma control system should be considered to ensure that process goals are met.





True





False








78.




The Nonparametric equivalent to the parametric hypothesis test for the One Sample t Test is _______________ .





ANOVA





Two Sample t Test





One Sample Sign Test





Regression Test







79.




As the sample size increases, the variation associated with the distribution of sample means __________________.





decreases





increases





does not change





none of the above








80.




A process has a mean of 20 and a standard deviation of 1. It is normally distributed. Approximately 5 percent (ignore rounding) of the observations would fall outside _______________.





19 to 21





13 to 27





17 to 23





18 to 22








81.




A normal distribution can be described as _______________ .





bell-shaped and symmetrical





bell-shaped but not symmetrical





bell shaped but with a longer tail to the right





bell-shaped but with a longer tail to the left








82.




A process is in-control and stable. What type of variation would be expected?





Special Cause Variation





Non-Random Variation





Common Cause





Accidental Variation