7. 'm' processes share 'n' resources of the same type. The maximum need of each process doesn't exceed 'n' and the sum all the their maximum needs is always less than m + n. In this set up a. deadlock...

























7.'m' processes share 'n' resources of the same type. The maximum need of each process doesn't exceed 'n' and the sum all the their maximum needs is always less than m + n. In this set up
a.deadlock can never occur
b.deadlock may occur
c.deadlock has to occur
d.none of these