542182A) WBS diagram: (5 marks) Draw a diagram or write a hierarchical list showing WBS from level 1 (Project) to the deliverable Level 2 and 3,level 3 is to be the location and stage identification...


542182A) WBS diagram:   (5 marks)
Draw a diagram or write a hierarchical list showing WBS from level 1 (Project) to the deliverable Level 2 and 3,level 3 is to be the location and stage identification which is going to be the base for your work packages tasks .
B) Work Package list (5 marks)
Create a list of work packages, being tasks which will produce your deliverables from level 2 and 3 Link the deliverables with the work packages. The detailed submission of work packages should include cover at least 5 elements applicable to the construction phase of this project, except P&G, margins and preliminaries however you should include mobilisation items. Use the provided Rawlinsons elemental break down to assist in the definition of the construction elements.
Q2.1a and b may be included on the same diagram if required








2.2 TASK DURATIONS (10 marks)



A) Task duration spread sheet: (10 Marks) make up your own template
Calculate task durations for the least 20 different tasks. For the rest of the tasks you can use your best estimate.



For your calculations use a rough measurement of the quantities. Consider the actual work sequence and possible construction zones for each task i.e. you might need to divide one task to several ones because of the sequence or zones, if you have not already done this in the previous stage. Use published work rates or labour constants from (Rawlinson s NZ Construction Handbook). Assumption of work rates may be necessary where there are no available data. Indicate when you have used an assumption instead of published data and explain what your assumption is based on.
Ensure you reference your source of labour rates.



The chosen twenty task durations are to be presented in spreadsheet format. Present the quantities, labour constants and labour resources using appropriate formulas and units. This is to include appropriate level of detail. Demonstrate appropriate judgement in selecting gang size of workers/tradesmen. For the rest of the tasks, duration only is required.
Submission and file type: MS Office






2.3 CONSTRUCTION METHODOLOGY (20 marks)



A) Construction methodology statement: (20 marks)
Prepare a proposed construction methodology statement to communicate the work methods and sequence to the client and to demonstrate the anticipated work sequence and staging. It is permissible to use the construction methodology sample as a template but all details apart from section headings will be applicable to this project and your own ideas.
Analysis the project and select appropriate methodology, which clearly addresses the issues and the specific requirements of this project
-Identify the risks applicable to a project of this nature
-    Describe logical construction sequence
-    List out the resource requirements to include material, labour and plants/equipment, and other items as appropriate
-    List out the main site set up requirements
-    Use diagrams, images and details to assist in developing logical construction sequence, and communicate understanding of the project methodology
-    Use correct terminology