5.33 Two methods of carrying away surface runoff water from a new subdivision are being evaluated: Method A. Dig a ditch. The first cost would be $60,000, and $25,000 of redigging and shaping would be...


q5.33


5.33 Two methods of carrying away surface runoff water from a new subdivision are<br>being evaluated:<br>Method A. Dig a ditch. The first cost would be $60,000, and $25,000 of redigging<br>and shaping would be required at five-year intervals forever.<br>Method B. Lay concrete pipe. The first cost would be $150,000, and a replace-<br>ment would be required at 50-year intervals at a net cost of $180,000 forever.<br>At i = 12%, which method is the better one?<br>

Extracted text: 5.33 Two methods of carrying away surface runoff water from a new subdivision are being evaluated: Method A. Dig a ditch. The first cost would be $60,000, and $25,000 of redigging and shaping would be required at five-year intervals forever. Method B. Lay concrete pipe. The first cost would be $150,000, and a replace- ment would be required at 50-year intervals at a net cost of $180,000 forever. At i = 12%, which method is the better one?

Jun 05, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here