1.14 Assume a program requires the execution of 50 x 106 FP instructions, 110 x 106 INT instructions, 80 x 106 L/S instructions, and 16 x 106 branch instructions. The CPI for each type of instruction...


dont post duplicates will surely dislike



1.14 Assume a program requires the execution of 50 x 106 FP instructions,<br>110 x 106 INT instructions, 80 x 106 L/S instructions, and 16 x 106 branch<br>instructions. The CPI for each type of instruction is 1, 1, 4, and 2, respectively.<br>Assume that the processor has a 2 GHz clock rate.<br>1.14.1 (10] <$1.10> By how much must we improve the CPI of FP instructions if<br>we want the program to run two times faster?<br>1.14.2 [10] <$1.10> By how much must we improve the CPI of L/S instructions<br>if we want the program to run two times faster?<br>1.14.3 [5] <$1.10> By how much is the execution time of the program improved<br>if the CPI of INT and FP instructions is reduced by 40% and the CPI of L/S and<br>Branch is reduced by 30%?<br>

Extracted text: 1.14 Assume a program requires the execution of 50 x 106 FP instructions, 110 x 106 INT instructions, 80 x 106 L/S instructions, and 16 x 106 branch instructions. The CPI for each type of instruction is 1, 1, 4, and 2, respectively. Assume that the processor has a 2 GHz clock rate. 1.14.1 (10] <$1.10> By how much must we improve the CPI of FP instructions if we want the program to run two times faster? 1.14.2 [10] <$1.10> By how much must we improve the CPI of L/S instructions if we want the program to run two times faster? 1.14.3 [5] <$1.10> By how much is the execution time of the program improved if the CPI of INT and FP instructions is reduced by 40% and the CPI of L/S and Branch is reduced by 30%?

Jun 06, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here