The following data have been recorded for recently completed Job 623 on its job cost sheet. Direct materials cost was Rs. 3,340. A total of 45 direct labor-hours and 121 machine-hours were worked on the job. The direct labor wage rate is Rs. 15 per labor-hour. The Corporation applies manufacturing overhead on the basis of machine-hours. The predetermined overhead rate is Rs. 17 per machine-hour. The total cost for the job on its job cost sheet would be: