1 В The following jobs are waiting to be processed at the same machine center. Jobs are logged as they arrive: A Job Due Date Duration (days) A 313 8 4 E 312 16 5 C 325 40 D 314 The average tardiness...

please answer within 30 minutes.1<br>В<br>The following jobs are waiting to be processed at the same machine center. Jobs are<br>logged as they arrive:<br>A<br>Job<br>Due Date<br>Duration (days)<br>A<br>313<br>8<br>4<br>E<br>312<br>16<br>5<br>C<br>325<br>40<br>D<br>314<br>The average tardiness (job lateness) for the sequence developed using the EDD rule =<br>E<br>314<br>3<br>4.20 days (round your response to two decimal places).<br>All dates are specified as manufacturing planning calendar days. Assume that all jobs<br>arrive on day 275. Assume each job starts at the beginning of the day and finishes at<br>the end of the day (a job that begins on day 275 and takes 8 days will finish on day<br>282, and the next job begins in the morning of day 283). Compute all times based on<br>initiating work on day 275.<br>The percentage utilization for the sequence developed using the EDD rule = 41.62 % (enter<br>your response as a percentage rounded to two decimal places).<br>c) Using the SPT (shortest processing time) decision rule for sequencing the jobs, the order<br>is (to resolve a tie, use the order in which the jobs were received):<br>Sequence<br>Job<br>1<br>

Extracted text: 1 В The following jobs are waiting to be processed at the same machine center. Jobs are logged as they arrive: A Job Due Date Duration (days) A 313 8 4 E 312 16 5 C 325 40 D 314 The average tardiness (job lateness) for the sequence developed using the EDD rule = E 314 3 4.20 days (round your response to two decimal places). All dates are specified as manufacturing planning calendar days. Assume that all jobs arrive on day 275. Assume each job starts at the beginning of the day and finishes at the end of the day (a job that begins on day 275 and takes 8 days will finish on day 282, and the next job begins in the morning of day 283). Compute all times based on initiating work on day 275. The percentage utilization for the sequence developed using the EDD rule = 41.62 % (enter your response as a percentage rounded to two decimal places). c) Using the SPT (shortest processing time) decision rule for sequencing the jobs, the order is (to resolve a tie, use the order in which the jobs were received): Sequence Job 1

Jun 10, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here