1-110 Electrical Installation and Estimation 5. A building is to be provided with C.T.S. wiring and the details of load are as given below Location Lamp (60 W) Fan (80 W) 5 A Socket outlet 15 A Societ...

A building is to be provided with CTS wiring and details of load given below1-110<br>Electrical Installation and Estimation<br>5. A building is to be provided with C.T.S. wiring and the details of load are as given below<br>Location<br>Lamp (60 W)<br>Fan (80 W)<br>5 A Socket outlet<br>15 A Societ outlet<br>Varandah<br>1<br>Hall<br>1<br>Bed Room<br>1<br>Ketchen<br>1<br>1<br>(i) Design the specifications of<br>(a)<br>Main switch<br>(b)<br>Distribution Board<br>(c)<br>Conductor from meter board to distribution and<br>(d)<br>Conductor for sub-circuits.<br>(a) Draw the wiring diagram for the entire load.<br>(March/April. 2005)<br>

Extracted text: 1-110 Electrical Installation and Estimation 5. A building is to be provided with C.T.S. wiring and the details of load are as given below Location Lamp (60 W) Fan (80 W) 5 A Socket outlet 15 A Societ outlet Varandah 1 Hall 1 Bed Room 1 Ketchen 1 1 (i) Design the specifications of (a) Main switch (b) Distribution Board (c) Conductor from meter board to distribution and (d) Conductor for sub-circuits. (a) Draw the wiring diagram for the entire load. (March/April. 2005)
ep -size<br>ondwit of<br>length of ca<br>the layout<br>ar<br>19<br>Dístsik<br>1-110<br>Electrical Installation and Estimation<br>5. A building is to be provided with C.T.S. wiring and the details of load are as given below<br>Location<br>Lamp (60 W)<br>Fan (80 W)<br>5 A Socket outlet<br>Varandah<br>15 A Societ outlet<br>1<br>1<br>Hall<br>Bed Room<br>2<br>Ketchen<br>(i) Design the specifications of<br>(a)<br>Main switch<br>(b)<br>Distribution Board<br>(c)<br>Conductor from meter board to distribution and<br>(d)<br>Conductor for sub-circuits.<br>(ii) Draw the wiring diagram for the entire load.<br>6.<br>Draw tho uin<br>(M<br>

Extracted text: ep -size ondwit of length of ca the layout ar 19 Dístsik 1-110 Electrical Installation and Estimation 5. A building is to be provided with C.T.S. wiring and the details of load are as given below Location Lamp (60 W) Fan (80 W) 5 A Socket outlet Varandah 15 A Societ outlet 1 1 Hall Bed Room 2 Ketchen (i) Design the specifications of (a) Main switch (b) Distribution Board (c) Conductor from meter board to distribution and (d) Conductor for sub-circuits. (ii) Draw the wiring diagram for the entire load. 6. Draw tho uin (M

Jun 10, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here