1.Suppose you are operating a machine which produces onlyone type of part and apart isproduced every 30 seconds (its cycle time). What is the capacity of yourmachine in units perhour?
2.You are atDisney World and wait 45 minutes to ride the roller coaster at Space Mountain.Guests board the roller coaster in batches of 20. The ride takes 3 minutes andall riders get off at the same time. What is the cycle time of this process?What is the throughputtime?
3.You are the manager of aSurgi-Center that performs minor surgical cases. The Center has 5 operatingrooms and, on average, each case takes 60 minutes to perform. After each caseclean-up requires 20 minutes. If the Center schedules its first case for 8:00a.m., no cases are performed between 12:00 and 1:00p.m., and the last case mustbe completed by 5:00, what is the daily capacity of the Center in cases? Whatare two ways you can increase the capacity of theCenter?
4.A process for making a product has five tasks, as shown in the Tablebelow. All machines are used for each task. A shift consists of 8 actual workhours. Calculate the yield for the process overall, assuming defective unitsare identified through inspection and scrapped at each task. Calculate theshift capacity, in units for each task. And lastly, which task is thebottleneck of thisprocess?
Task
Yield
Task Timefor Each Machine
Number ofMachines
Shift Capacity (units)
1
0.95
6 minutes
3
2
0.82
4 minutes
0.97
2 minutes
4
0.92
3 minutes
5
0.89
Total
XXXXXXXXX